Flooring and Walls coming Along

The doors are being painted and hung. The toilets are in and the sinks! The carpet in the gym is on the walls and hung!

This slideshow requires JavaScript.

December 20, 2011

Doors In, Furnaces In, and Dry Wall Going Up

The furnaces have been put in to place. The final doors have been installed. The dry wall is going up!

This slideshow requires JavaScript.

December 20, 2011

Insulation Is In

The insulation has gone in at the church.  All the electric, plumbing, and heating/cooling lines are all in place.

This slideshow requires JavaScript.

November 8, 2011

We are Under Roof!

We are completely under roof now! All the roof is sheeted and will be felted by the end of the evening. Bricks were delivered, so were doors and windows! Tomorrow the block guys are supposed to start building the block wall all the way through the attic for the fire wall. Bricking will begin once all the doors and windows are in place! Praise God for all the sunny weather to get us along this far!

This slideshow requires JavaScript.

November 1, 2011

Roof Going Up

The trusses are being put in place. Today they brought in the crane and started lifting and placing the trusses.

This slideshow requires JavaScript.

October 25, 2011

Walls Are Going Up!

This week the walls on the outside of the building have gone up! Today the walls inside started going up…pretty soon it will be time for the roof to be put on!

This slideshow requires JavaScript.

October 24, 2011

Who Ordered the Moat?!?!

Last week the builders came to a standstill when rain came! Then it kept raining and created a moat around the new building!

This slideshow requires JavaScript.

October 18, 2011

Walls Are Being Built!

Wood has been delivered and walls are being built! One whole wall has been built and will be raised soon!

This slideshow requires JavaScript.

October 14, 2011

Concrete Floor

The concrete floor was poured today! Bright and early this morning the workers started showing up to lay down plastic and start pouring, spreading, and floating the concrete slab. The concrete slab is now done and looking great! REMEMBER…DO NOT go around the construction site without permission from Pastor Mark!!! He will tell us when it is safe to be around there. The concrete needs time to cure, so please DO NOT walk on it!

This slideshow requires JavaScript.

October 13, 2011

Gravel Going In

This slideshow requires JavaScript.

Yesterday and today gravel trucks have been spreading gravel for the floor. Tomorrow they are expected to pour the concrete floor! All the pipes are in place, gravel is laid, and doors have been cut out in the correct areas now. Pray that the rain doesn’t slow down or stop the floor pouring tomorrow!